Plumber (PLU)

Third Period Package (31 Modules) Comments

Date: 11/6/2020 7:23:35 AM
Module: 060301a
Version: 21.0
Page: 13
Comment: Figure 15 should have: "or" rather than "of".... so would read: "Flood Gate or Flood Check" as in paragraph directly below.
Status: Approved for Review

Date: 11/6/2020 10:57:25 AM
Module: 060301a
Version: 21.0
Page: 28
Comment: second paragraph, fourth sentence just before it says" (Table 2.5.8.1)", has an errant line, ("a 1-1/2" wet vent"), that should be removed: "The section of the wet vent between the bathtub...this section of pipe and a 1-1/2" wet vent (Table 2.5.8.1) states that 2" is required... should be corrected to read: "...this section of pipe and Table 2.5.8.1 states that 2" is required... I also would remove the brackets from around Table 2.5.8.1
Status: Approved for Review

Date: 1/5/2021 2:14:13 PM
Module: 060301a
Version:
Page:
Comment: Not specifically this ILM but overall these ILM’s need to be re-proofed. That’s assuming they were once already but not very well. Lots of misleading info contradicting the National plumbing code and the Gas code.
Status: Update in Progress

Date: 2/23/2021 3:04:55 PM
Module: 060302bA
Version: 21.0
Page: 10
Comment: Under Example 8 in the third sentence, there has been a typo. Either: "The line grades down at 1% ..." or "The line grades down at 1/8" per foot..." not the mishmash that currently is there. And really, being 2" drainage piping, it should be 2% or 1/4" per foot. The math in the example below the figure would have to be changed if the grade in the example was altered to meet code.
Status: Approved for Review

Date: 6/17/2021 10:03:39 AM
Module: 060304c
Version: 21.0
Page: 18
Comment: Self Test questions 4, 5 and 6 are missing.
Status: Implemented

Date: 2/23/2021 3:07:03 PM
Module: 060304dA
Version: 21.0
Page: 9
Comment: Looking at Examples in Objective Two, I feel the examples should start at #1 under a new Objective. So then example 7 and 8 would be 1 and 2. That being said, Example 7 has an error in Figure 4. The measurement shown should either say 30 m or the end dimension line needs to be moved to the start of the piping, rather than starting at the first hanger. In the statement below, it says there should be 12 hangers, even though there are only 11 shown. there is only .5 meters left, and the starting hanger is .5 meters in, so to add a hanger at the end, we should really add one at the start, and that would make 13. I think it is over complicating the example and should just stay at 11.
Status: Approved for Review


Archived Comments

There are no archived comments to view for this package.